The Weapons Release Facility (WRF) project at Buckley Air Force Base consists of a renovation of the existing building (Building 805) along with construction of a 4,100 square foot addition. The facility houses munitions and ordinance. The project will be designed to meet the US Green Building Council standards for LEED Major Renovation Silver rating.
As Commissioning Agent, E Cube will develop and execute the Commissioning Plan. This plan consists of comprehensive, multi-stage commissioning process for the mechanical (HVAC) which includes a heat pump heating/cooling system for the administrative area of the building, electrical, HVAC controls and lighting controls. For each piece of major equipment and combined system, this process will include on-site pre-functional (installation phase) checkout procedures, test & balance review, functional performance checkout procedures, integrated system operation checkout procedures, operation and maintenance manual coordination and review, issue identification and resolution expediting, and management of all associated documentation. In addition, E Cube will perform a post-Construction warranty review. Commissioning activities will conclude with a final report to the owner, which review the results and include all documentation completed/collected during the process.