E Cube

Energy | Efficiency | Environment

  • Home
  • About
    • Clients
    • Story
    • People
    • Approach
    • News
  • Services
    • New Building Commissioning
    • IECC Commissioning
    • Retro-Commissioning
    • LEED Services
    • Fault Detection & Diagnostics
    • Existing Building Optimization
    • Building Enclosure Commissioning
    • Measurement & Verification
    • Energy Benchmarking
    • Troubleshooting
    • Due Diligence
    • Contractor Support
    • Sustainable Design Programs
    • Utility Programs
  • Projects
    • Healthcare
    • Higher Education
    • K-12
    • Hospitality
    • Laboratories
    • Data Centers
    • Commercial Office
    • Governmental
    • Aviation
    • Central Plants
  • Contact

Adobe Offices

Location: Lehi, UT
Project Floor Area: 264,000 sf
Project Cost: $72 Million
Completion: Dec 2012
LEED Rating: Gold

E Cube is providing LEED-based Commissioning Services for the Adobe Systems Office Building.  When Adobe Systems acquired Omniture they were faced with the need of creating a large campus in Utah that would provide flexible, cost effective office space – this facility represents the result.  The new building will promote the recruitment and retention of top talent and incorporates the differing cultures of both the acquired and parent company.

E Cube is currently providing Commissioning Services on Phase II of the campus.

Key E-Cube Services for this project:

  • Development assistance and review of the Owner’s Project Requirement and Basis of Design documents
  • Design assistance review at the DD and CD phases
  • Commissioning documents including: Cx Spec, Cx Plan
  • Inspections of pre-purchased equipment
  • Pre-functional equipment and systems documentation
  • Functional equipment and systems operation documentation
  • Oversight of contractor pre-startup testing
  • Oversight of the startup process
  • Oversight of Test & Balance procedures and performance
  • Subsystem and system functional performance testing
  • Review of Operation and Maintenance Manuals
  • Review of Operation and Maintenance Training
  • Commissioning Report
  • Systems Manual
  • Warranty Phase follow-up review