E Cube has extensive experience in commissioning over 80 data centers nationwide. These mission critical facilities require thorough commissioning plans that assess the critical links between multiple building systems. This helps to ensure fail-safe operations in emergency situations such as brownouts, power surges or complete power failure.
E Cube recognizes the critical nature of continuous building operations for the data center’s complex information technology equipment. Our focus is on elements such as system redundancy, emergency power, cooling requirements, uninterrupted power supply, generator loads, and transformer loads.