E Cube

Energy | Efficiency | Environment

  • Home
  • About
    • Clients
    • Story
    • People
    • Approach
    • News
  • Services
    • New Building Commissioning
    • IECC Commissioning
    • Retro-Commissioning
    • LEED Services
    • Fault Detection & Diagnostics
    • Existing Building Optimization
    • Building Enclosure Commissioning
    • Measurement & Verification
    • Energy Benchmarking
    • Troubleshooting
    • Due Diligence
    • Contractor Support
    • Sustainable Design Programs
    • Utility Programs
  • Projects
    • Healthcare
    • Higher Education
    • K-12
    • Hospitality
    • Laboratories
    • Data Centers
    • Commercial Office
    • Governmental
    • Aviation
    • Central Plants
  • Contact

Laramie School District #1 – Afflerbach Elementary School

Location: Cheyenne, WY
Project Floor Area: 61,333 sf
Project Cost: $9.3 Million
Completion: Aug 2010
Project Manager: Trey King

E Cube provided Commissioning on this multiple-phase renovation of Afflerbach Elementary in Cheyenne, WY. – Which included mechanical, electrical and controls systems commissioning. Specific equipment includes AHUs, VAVs, Boilers, Pumps, Split-Systems, Re-heat coils, and Fan coil units. Air conditioning was provided by roof mounted air-cooled Dx refrigeration units.  Temperature control was provided by a new Johnson Control system.

Key E Cube Services for this project

  • Pre-functional (installation) review of equipment and systems
  • Oversight and review of contractor testing and startup procedures and documentation
  • Oversight of Test & Balance contract, procedures and performance
  • Functional (operational) review of equipment and systems
  • O&M manual coordination and review
  • Owner training oversight, supervision and review
  • Commissioning Report and LEED Systems Manual