E Cube provided Commissioning on this multiple-phase renovation of Afflerbach Elementary in Cheyenne, WY. – Which included mechanical, electrical and controls systems commissioning. Specific equipment includes AHUs, VAVs, Boilers, Pumps, Split-Systems, Re-heat coils, and Fan coil units. Air conditioning was provided by roof mounted air-cooled Dx refrigeration units. Temperature control was provided by a new Johnson Control system.
Key E Cube Services for this project
- Pre-functional (installation) review of equipment and systems
- Oversight and review of contractor testing and startup procedures and documentation
- Oversight of Test & Balance contract, procedures and performance
- Functional (operational) review of equipment and systems
- O&M manual coordination and review
- Owner training oversight, supervision and review
- Commissioning Report and LEED Systems Manual