E Cube

Energy | Efficiency | Environment

  • Home
  • About
    • Clients
    • Story
    • People
    • Approach
    • News
  • Services
    • New Building Commissioning
    • IECC Commissioning
    • Retro-Commissioning
    • LEED Services
    • Fault Detection & Diagnostics
    • Existing Building Optimization
    • Building Enclosure Commissioning
    • Measurement & Verification
    • Energy Benchmarking
    • Troubleshooting
    • Due Diligence
    • Contractor Support
    • Sustainable Design Programs
    • Utility Programs
  • Projects
    • Healthcare
    • Higher Education
    • K-12
    • Hospitality
    • Laboratories
    • Data Centers
    • Commercial Office
    • Governmental
    • Aviation
    • Central Plants
  • Contact

University of California Berkeley

Location: Berkeley, CA
Project Floor Area: 200,000 sf
Project Cost: $160 Million
Completion: Fall 2012
LEED Rating: Gold

Li Ka Shing Center for Biomedical and Health Sciences

This state-of-the-art research lab is a new 200,000 gross square foot facility that includes research and teaching labs, classrooms, offices and auditorium space. The building was constructed in phases, starting with a core and shell project.

As the Commissioning Authority, E Cube developed and executed the Commissioning Plan and helped to ensure the BSL lab was ready for verification and certification. The commissioning plan consisted of a comprehensive, multi-stage commissioning process for the Mechanical (HVAC), Electrical, HVAC Controls, Lighting Controls and Emergency Backup Systems.

For each piece of major equipment and combined systems, the process included on-site pre-functional (installation phase) checkout procedures, start-up testing observation, test & balance review, functional performance checkout procedures, integrated system operation checkout procedures, operation and maintenance manual coordination and review, owner’s staff training coordination, issue identification and resolution expediting, and management of all associated documentation.  Commissioning activities concluded with a final report to the owner, which reviewed the results and included all documentation completed/collected during the process.

 